Maidstone West BTP
Client: Southeastern Railways & BTP
Duration: 8 months
Value: £321,000
WPB Contractors were procured to head up the design and build of this refurbishment project as Principle Contractor covering a full CDM role.
At the outset the platform building was in a derelict condition and following structural and building surveys it was found that the ceiling joist, floor joist, wall plates and a number of rafters were rotten and in need of replacing. A step by step design and methodology was put together for the approval of Network Rail, the asset landlord.
BTP Works scope included a number of building, refurbishment and M&E works which involved some of the following; Demolition, Brick facia blast cleaning, Electrical, Carpentry, Air conditioning, door entry, suspended ceiling grids, wall partitioning, plastering and more.