Hertford North Station
Client: First Capital Connect
Duration: 5 months
Value: £318,000
WPB Contractors was procured to head up the design and build of this refurbishment project as Principle Contractor covering a full CDM role.
The project was to supply and install hook on polyester powder coated aluminium cassette panels and profiled aluminium ceiling cladding. An interesting feature of this contract was the requirement for the cladding panels to be demountable to allow for regular inspection of the subway structure behind. In addition to this, integrated lighting systems were installed within the panels.
We also completed the installation of GRP stair nosing’s and flooring throughout the subways as well as nylon warm touch DDA compliant handrails to staircases and ramps.