Cricklewood Station Subway & Stairwell Cladding Project
Value: £386,000
Contract:
Duration: 5 Months
WPB Contractors was procured to head up the design and build of this refurbishment project as Principle Contractor covering a full CDM role.
Supply and Installation of Hook On Polyester Powder Coated Aluminium Cassette Panels & Profiled Aluminium Ceiling Cladding. An interesting feature of this contract is the requirement for the Cladding Panels to be Demountable to allow for regular inspection of the subway structure behind. Integrated lighting system installed within the panels.
GRP stair nosing’s installed.
Nylon warm touch DDA compliant handrails installed to staircases and ramps.