Strood Station
Client: Southeastern Railways
Duration: 10 months
Value: £2,000,000
WPB Contractors was appointed to demolish and build the new Strood Station as a Principle Contractor covering a full CDM role.
The existing station building was a traditional Clasp building which was beyond refurbishment. WPB was to undertake the roll of M&E designer with a number of CDP items including but not limited to temporary works, structural steel frame, canopies and curtain wall glazing.
With the scope of works including a number of Building, Civil Engineering and M&E works which involved some of the following:
- Demolition of existing Building
- Platform Surface Refurbishment
- Asbestos Removal
- Drainage
- Car Park remodel
- Brick/Block
- Electrical
- Mechanical
- Carpentry
- Heat Recovery System
- Air Conditioning
- Fire & Heat Detection System
- YOB Stopper Doors
- Communication System
- Roofing
- Cubic Gateline Install
- Roller Shutters
- Suspended Ceiling Systems
- CCTV
- Plastering
- Aluminium Auto Doors
- Internal Manifestation Glazing
- Window Tinting
- Pipe Laying
- Floor tiles/Carpet tiles
- Brickwork Blast Cleaning
The project was successfully completed on time and within budget.